We handle the build from design and site prep to framing and finishing.

1234
  1. Design

    We plan the size, layout and floor plan around how you'll use the building, so you can see it before construction begins.

  2. Site prep

    We get the ground ready before the first post goes in.

  3. Framing

    Posts, girts and trusses go up on your site.

  4. Finishing

    Metal roofing and siding close it in, ready to use.

How long does it take?

Every project is different, but most post-frame buildings go up much faster than traditional construction. Here's what's typical.

  • Small shop or garage

    Around 30x40 to 40x60

    Start to finish

    1 to 2 months

    Design and permits
    2 to 4 weeks
    On site
    1 to 2 weeks
  • Large building

    Ag or commercial, 60x100 and up

    Start to finish

    2 to 4 months

    Design and permits
    4 to 8 weeks
    On site
    3 to 6 weeks
  • Barndominium

    Living space under a post-frame roof

    Start to finish

    6 to 12 months

    Design and permits
    6 to 12 weeks
    Building shell on site
    4 to 8 weeks
    Interior finish
    4 to 8 months

Typical ranges, not a promise. Start to finish includes ordering materials and getting on the schedule. Your free quote comes with a timeline for your building.

Wood posts and roof trusses of a post-frame building going up, with a scissor lift inside

What moves your timeline

Size
Bigger footprints and taller walls mean more posts, trusses and steel to set.
Site prep
Level, dry ground with good access gets us building sooner. Grading or fill adds time.
Weather
Heavy rain, high wind and frozen ground can pause work on site.
Permits
Review times vary by county and city, and commercial buildings usually take longer.
Custom features
Extra doors, windows, lean-tos and interior work all add time.

Tell us about your building.

Free quotes. We'll call you back.